Saturday, October 30, 2010

November already????







Well not a lot of progress, so I thought some fresh pictures would be nice. A little powder coating, floor boards stained and varnished ready to install. Fuel pump and gas tank installed. The distributor rebuilt with a positive ground pertronix installed.
Oh almost forgot to mention that the rear springs were reversed end for end so once that was changed the gas tank, and drive shaft fit perfectly! DUHHHHHH.

1 comment:

  1. Just checking in. The new place looks great along with the car. I want a ride when its done. The garage looks like a great place to finish the project. Mine is all tucked in waiting for spring. :-( Have you got an estimated finish date? Merry Christmas and say hello to Mom and Pop.

    ReplyDelete