Sunday, April 3, 2011

Spring time

Complete rolling chassis. I splurged a little and put her on some new 60 spoke chrome wheels.

Sunday, January 2, 2011

Brakes and Exhaust




SU Carbs.com



Some photos of the rebuild carbs from Chester Gillings at SU Carbs.com. Fantastic workmanship at very reasonable prices.

SU Carbs.com
Chester Gillings
1604 Spruce St.
Pueblo, Co 81004
(719)647-0028
chester@sucarbs.com



Saturday, October 30, 2010

November already????







Well not a lot of progress, so I thought some fresh pictures would be nice. A little powder coating, floor boards stained and varnished ready to install. Fuel pump and gas tank installed. The distributor rebuilt with a positive ground pertronix installed.
Oh almost forgot to mention that the rear springs were reversed end for end so once that was changed the gas tank, and drive shaft fit perfectly! DUHHHHHH.

Wednesday, August 25, 2010


This past weekend I did a few odds and ends to the motor. Valve cover, thermostat and cover and new intake/exhaust studs and gasket.
Im sending the Dizzy out to Advanced Distributers on Monday for a rebuild.



Monday, August 2, 2010

Home in Murfreesboro



Well we finally made it! Here are some shots of the garage. It's a little to warm outside to work on the MGA, but fall is just around the corner.
Many new parts are ready to be installed...fuel system and hydraulics. I have the distributor and carbs boxed up and ready to send out for rebuilds.

Sunday, May 2, 2010

Ready to move




Engine and Transmission in and ready to move!


Friday, April 9, 2010

Engine primer and paint





The Drive Train

Joann and I spent last Saturday stripping the engine getting it ready for paint. With our upcoming move to Nashville we figured it would be easier to move the rolling chassis with the engine and transmission installed.

Saturday, March 27, 2010

Next the transmission.

We finished with the rear suspension today. Installing new rear axle bearings and seals.
I have added some additional pictures showing the re-built front and rear shocks. I put the final coat of paint on the steering rack, so tomorrow we plan on doing the front hub bearings and installing the steering rack.







Saturday, March 13, 2010

Front Suspension and Rear Suspension Complete


Joann busting knuckles!
We used a ratchet strap to compress the spring.




Finished RH side

Joann cleaning parts.